What belongs in a site report?
A site report (also called a site diary) should record at least the following for each day or work stage:
- Date and weather conditions
- Staff present and their trades
- Working hours
- Work carried out
- Material used
- Notable incidents and obstructions
- Defects identified, with status (open/resolved)
- Photos for documentation
Why a report matters
A gapless report protects you in disputes over delays, additional work or defects – whoever has documented the construction process in a traceable way is in a much stronger position if there's doubt.
Site diary or site report: what is the difference?
In everyday use both terms mean much the same. A site diary is kept continuously, often daily, and records how the work progresses. A site report usually documents one visit or stage, for example an inspection or handover. The template below suits both: fill in the details for the day or visit and print a fresh sheet for each day.
Keeping a site diary: the simplest way
- One sheet per working day, with the date, so nothing is missing.
- Fill it in on site, not at the weekend.
- Take dated photos and note them on the sheet.
- Collect all sheets in one folder, sorted by date.
Recording a site meeting
At a site meeting you note the date, attendees, items discussed, decisions and responsibilities with deadlines. Enter this in the field for special occurrences or add a second sheet. At the end, have the attendees sign the record.
Printable checklist
Site report / site diary
Sheet no.: ______| Name | Company / trade | Time from – to | Hrs |
|---|---|---|---|
| Material used | Quantity |
|---|---|
| No. | Defect / description | Location / component | Status |
|---|---|---|---|
| 1 | ☐ open ☐ fixed | ||
| 2 | ☐ open ☐ fixed | ||
| 3 | ☐ open ☐ fixed |